Project Case Study

Driveway Paver Cleaning, Sanding & Sealing in Rockledge, FL

In November 2026, Surfside Pressure Washing cleaned, sanded, and sealed an approximately 1,000-square-foot paver driveway in Rockledge, Florida. It had been more than two years since the driveway was last cleaned and more than six years since its last sanding and sealing. The work included premium joint sand and two coats of professional-grade two-part urethane sealer.

Project photographs

Wide view of a Rockledge paver driveway before cleaning, sanding and sealing on the left and after on the right
View from the street: before on the left, after on the right. The approximately 1,000-square-foot paver driveway received cleaning, joint sanding, and two coats of sealer. The concrete apron is a separate surface.
Closer view of Rockledge driveway pavers before treatment on the left and after joint sanding and two coats of urethane sealer on the right
Closer driveway view: before on the left, after on the right. The after photograph shows the treated pavers and an area taped off from traffic. Lighting and shadows differ between photographs, so color differences should not be attributed solely to sealing.

Returning to driveway maintenance after several years

The owner reported that this driveway had gone more than two years without cleaning and more than six years without sanding and sealing. Surfside addressed the paver surface and joints together as a single cleaning, sanding, and sealing project. That maintenance history describes this property; it is not a recommended interval for every driveway.

Cleaning the paver driveway

The first part of the work was cleaning the approximately 1,000-square-foot paver driveway before joint sanding and sealing. Cleaning is a separate step from applying a coating: existing surface conditions and any previous sealer need to be considered when planning a paver project. This job's photographs show the overall before-and-after result rather than every preparation step.

Premium joint sand and two coats of sealer

After cleaning, Surfside sanded the paver joints using premium joint sand and applied two coats of professional-grade two-part urethane sealer. Joint sanding addresses the spaces between the pavers, while sealing treats the surface. The scope here was cleaning, sanding, and sealing—not paver replacement or driveway reconstruction.

Before-and-after results

The two comparisons show the completed driveway from the street and from a closer angle. They document the appearance of this Rockledge project using original photographs. The before images were taken under overcast skies, while the after images have stronger sunlight and shadows. The photos are evidence of this completed work, not a promise of a particular finish or years of protection for another driveway.

Aftercare: foot traffic and vehicle access

For this job, Surfside recommended avoiding foot traffic for 12–24 hours if possible and keeping vehicles off the driveway for 48 hours. These were the project-specific instructions given to the homeowner, not a statement that every sealer fully cures within that time. Follow the instructions provided for your own product and site conditions, and contact Surfside before reopening the area if conditions have changed or you are unsure.

Paver and roof care at the same Rockledge property

This was the same property featured in Surfside's November 2026 Rockledge concrete tile roof case study. While there for the paver work, Glenn noticed roof buildup, and the homeowners chose to have the roof soft washed before receiving an HOA letter. The roof and driveway were separate cleaning scopes; the related case study documents the roof work.

Frequently Asked Questions

What did this Rockledge paver project include?

The approximately 1,000-square-foot driveway received cleaning, sanding with premium joint sand, and two coats of professional-grade two-part urethane sealer in November 2026.

When had the driveway last been cleaned and sealed?

According to the project details supplied by Surfside, it had been more than two years since the last cleaning and more than six years since the last sanding and sealing. Those are this property's maintenance intervals, not a general recommendation.

What sealer was used on this driveway?

Surfside applied two coats of professional-grade two-part urethane sealer. A product brand and specific sheen are not identified in this case study.

When could the homeowner walk or park on the driveway?

Surfside recommended no foot traffic for 12–24 hours if possible and no vehicles for 48 hours for this project. Follow the instructions for your own job and product; traffic restrictions are not the same as a universal full-cure time.

Was this the same property as the Rockledge roof-cleaning project?

Yes. Glenn noticed the roof needed attention while at this property for paver cleaning, sanding, and sealing. The separate roof case study shows that work.

Roof cleaning at the same Rockledge property →

Planning a paver cleaning, sanding & sealing project?

Request a free estimate or call to discuss your property.